← Back to storiesDeep dive · Carbon capture & removal

Who pays for the tonne?

Where is the venture-scale opportunity in carbon capture, removal and use?

In brief

Six takeaways

  1. Three carbon markets, three payers: industrial emitters fund regulated abatement, corporates buy verified removals, and industrial customers buy CO₂-based products. Equipment, software and MRV serve all three.

  2. At ~€82/t (October 2026), the EU carbon price falls short of many full-chain CCS costs (€70 to 250/t). Viability depends on capture costs, affordable transport and storage, and often subsidies.

  3. EU ETS relief applies to eligible geological storage or permanent mineralisation, not to removals simply certified under the CRCF, which neither guarantees demand nor ETS eligibility. Ocean CDR remains particularly uncertain.

  4. Durable CDR contracted 2.3 Mt in Q1 2026 (43% by Microsoft), but only 24% of funded companies had delivered any tonnes. Scaling requires bankable offtakes and financing beyond venture equity.

  5. We favour repeatable modular capture, mineralisation with standalone product economics, enabling technologies and selective CDR developers, not equity-funded infrastructure, DAC without credible cost reductions, unresolved ocean CDR or subsidy-dependent models.

  6. Energy majors and industrial groups are acquiring technologies and infrastructure before full maturity; consolidation among startups is also emerging.

The tonne's journey

Five steps, each with its challenges

A tonne of CO₂ passes through five physical steps, from source to storage or use, each with its own operator, costs and economic model.

Select a step to see who runs it and what drives its cost
CO₂ sourceIndustrial plant, biogenic stream or ambient air
CaptureSeparates CO₂ from other gases or from the air
ConditioningCleans, dries, compresses or liquefies
TransportPipeline, ship, rail or truck
StorageInjected deep underground, or mineralised
UseFuels, chemicals or materials, often temporary
Measurement, reporting and verificationEvery tonne is measured and certified

CO₂ source

CO₂ comes from an industrial process, from burning or fermenting, or is already in the air.

Who: The emitter (cement, lime, steel, chemicals, waste-to-energy, biogas). For direct air capture, the source is the atmosphere itself.

Cost driver: CO₂ concentration and purity, and how steady the output is.

Capture

CO₂ is separated from other gases or from the air.

Who: A technology vendor builds it. The emitter or a service operator runs it.

Cost driver: Heat and electricity, capture materials and their replacement, equipment size.

Conditioning

The CO₂ is cleaned, dried, then compressed or liquefied to transport specifications.

Who: The emitter, the capture vendor or the transport operator's terminal.

Cost driver: Electricity for compression and cooling.

Transport

Pipelines carry large, steady flows. Ships, rail or trucks serve small or scattered sources.

Who: Transport and storage operators.

Cost driver: Volume, distance and terminals.

Storage or use

Storage: injected underground or mineralised. Use: fuels, chemicals, materials, drinks.

Who: Storage operators (Northern Lights is run by Equinor, Shell and TotalEnergies), or industrial customers for use.

Cost driver: Site characterisation, wells and monitoring. For use, energy and the product market.

Measurement, reporting and verification

Every tonne is measured, reported and certified along the whole chain, so that the climate benefit can be proven.

Who: Project operators measure and report. Certification bodies verify, within frameworks such as the EU CRCF.

Cost driver: Sensors and data infrastructure, lifecycle accounting, and the cost of verification and certification for each project.

Market landscape

One value chain, four markets

Looking at CO₂ capture through these five steps reveals a fragmented market, with different technologies, cost drivers and business models along the value chain. Four distinct markets emerge: three end-markets (industrial CCUS from the emitter's perspective, durable CDR for atmospheric removals and CO₂ utilisation for downstream products), each with its own customers and sources of demand, and a fourth, cross-cutting market of enabling technologies and services supporting all three. Each presents a different set of opportunities and challenges for venture investors.

Industrial CCUS

Real regulatory demand, constrained economics

Market drivers

Process emissions
25%

Of direct industrial CO₂ emissions.

Cement
65%

Of cement emissions are process emissions, so electrifying heat leaves them in place.

EU carbon price
€82/t

EUA in October 2026, down from above €90 in January.

Under the EU ETS, recognised permanent CO₂ storage can reduce allowances surrendered by emitters. The ~€82/t EUA price (October 2026) creates an incentive, but may not cover capture, transport and storage costs, especially while free allocation applies.

What holds it back

EU ETS benefits depend on where the CO₂ ends up.

Capture alone does not reduce EU ETS obligations. Eligible geological storage or permanent chemical binding can avoid surrendering an allowance; the other routes below do not. CRCF certification does not change this distinction.

1 tonne captured Geological storage, mineral binding Fuels, drinks, dissolved bicarbonate Counts as not emittedStill counts as emitted No allowance to surrenderAllowance must be surrendered

✓Geological storage

In a site permitted under the EU CCS Directive, including beneath the seabed.

✓Permanent chemical binding

For example, qualifying mineralised building materials where the carbon remains bound for centuries (Delegated Regulation 2024/2620).

✕Fuels, drinks, greenhouses

The CO₂ is released again, so the allowance still has to be surrendered.

✕Dissolved bicarbonate

Including in seawater: possible long-term storage, but not currently recognised under the EU ETS.

Capture costs and storage access constrain the economics.

Dilute exhaust requires energy-intensive separation and site integration. Capture accounts for an estimated 60 to 70% of total CCUS costs (Equinor; project-dependent). Full-chain CCS costs are estimated at €70 to 250/t (CATF / Carbon Limits) or €130 to 230/t (IOGP / Rystad), against an EU ETS allowance price of ~€82/t in October 2026. These ranges are indicative and project-specific; the carbon price is a benchmark, not guaranteed revenue. Transport links and permitted storage capacity add cost and delay.

3 to 10 years
To develop a new geological storage site IEA

Northern Lights in Norway has 1.5 Mt/year of transport and storage capacity, with expansion planned to at least 5 Mt/year.

The entire value chain must be bankable.

Storage projects need aligned contracts between emitters, transporters and storage operators; utilisation needs a credible CO₂ buyer and product offtake. Without one counterparty, the project can stall: 80% of industrial bidders withdrew from a Danish CCS tender over unresolved value-chain risks (IEA, March 2026).

Financing remains selective: IEA estimates that around 90% of announced CCUS projects targeting 2035 have no final investment decision. More than $15bn of commercial debt was raised in the two years to March 2026, but in a few large deals. Europe has the EU Innovation Fund and a proposed €100bn Industrial Decarbonisation Bank; proposed support is not committed project finance.

Technology deep dive: point-source capture and geological storage
Technologies underneath

Point-source capture

Separating CO₂ from industrial emissions, typically before the gas reaches the atmosphere. The more dilute the stream, the more demanding the separation.

Integration remains critical: cement calcination (CaCO₃ → CaO + CO₂) generates process emissions even when heat is electrified. Calcium looping releases captured CO₂ by design, so downstream storage or use remains necessary. The same equipment can process biogenic CO₂, delivering removal rather than abatement if stored permanently.

How we judge it. Test CO₂ recovery and purity, thermal and electrical demand, installed CAPEX/OPEX and reliability on variable gas streams. Capture rate alone establishes neither net climate impact nor commercial readiness.

Capture configurations
Starting situationCapture configurationMain technical implications
Concentrated streamsFermentation, ammonia, biogas upgradingDirect purification, sometimes above 90% CO₂Little gas separation. Drying, purification, compression and transport remain necessary
Dilute exhaustCement, lime, waste-to-energy, steelPost-combustion capture, typically 3 to 30% CO₂High gas throughput, heat demand, impurities and integration with existing facilities
Pressurised process gasesHydrogen production, gasificationPre-combustion separationHigher CO₂ partial pressure helps separation, while process integration is complex
New or redesigned combustionOxy-fuel or chemical loopingSimpler downstream separation, offset by oxygen production or reactor complexity
Separation technologies
TechnologyHow it worksMain engineering constraints
Liquid solventsAbsorptionCO₂ reacts with a circulating liquid, often an amine, and heat regenerates the solventRegeneration heat, corrosion, solvent degradation and emissions
Solid sorbentsAdsorptionCO₂ binds to porous or functionalised solids and is released by temperature, pressure or vacuum cyclesWorking capacity, water competition, heat transfer, pressure drop and sorbent lifetime
MembranesCO₂ passes selectively under a partial-pressure gradientCompression energy, selectivity versus permeability, multistage separation
Electrochemical captureAn electrical potential changes CO₂ binding or releaseElectrical efficiency, electrode and membrane durability, current density
Calcium loopingCaO reacts with CO₂ to form CaCO₃, then heat regenerates CaO and releases concentrated CO₂High-temperature energy demand, material degradation, solids handling
Physical and cryogenic separationCooling, compression or phase changesEnergy use, contaminants, and limited suitability for dilute streams

Geological storage

SURFACESEALRESERVOIR

Captured CO₂ is conditioned, compressed and transported to deep saline aquifers or depleted hydrocarbon reservoirs, for injection and permanent storage. It serves industrial CCS, DACCS and BioCCS alike.

Security relies on structural trapping beneath impermeable seals, residual trapping in pores, dissolution in formation fluids and mineral reactions. Key safeguards are site characterisation, well integrity, pressure and plume monitoring, leakage prevention and long-term stewardship.

Investment view · What our European mapping suggests

Where venture capital fits

01 / The investment landscape

Our mapping of 43 European CCUS and CDR startups is a selective sourcing universe, not an exhaustive market or a funding database. It helps us see where proprietary technologies are emerging and frame what needs to be proven before investing.

Technology pathways in our sample
Direct air capture16
Mineralisation9
Point-source capture6
Enhanced rock weathering6
Ocean-based4
CO₂ conversion2

Primary technology classification, one category per company for this chart. Several businesses combine capture, storage and utilisation, so categories should not be read as mutually exclusive business models.

Technology pathways have different capital needs. Capture hardware, mineralisation, weathering, ocean pathways and CO₂ conversion serve different buyers and revenue models. A modular equipment supplier, a CDR developer and a materials company will not scale alike: separate equity for technical proof from capital for deployment.

Our sample signals activity, not investability. 34 of 43 companies were founded in 2021 or later. Pre-seed to Series A is a relevant sourcing lens, but funding rounds are not consistently tracked. The 16 DAC companies indicate experimentation, not proven cost competitiveness, durable deliveries or exit outcomes. Each pathway needs its own underwriting.

Enabling technologies are under-mapped. MRV, process software, components, conditioning and CO₂ logistics are not systematically covered. Build a separate sourcing universe before drawing conclusions about their attractiveness or competitive intensity.

Exit routes are technology-specific. Baker Hughes / Mosaic Materials illustrates industrial demand for capture IP; Airhive / Carbyon, DAC consolidation. ExxonMobil / Denbury is an infrastructure deal, not a startup valuation comparable. These transactions indicate potential acquirers, not reliable exit multiples.

Selected transactions and what they tell us about exits

Illustrative transactions, not a comprehensive European exit dataset. Some acquisition values were not disclosed, and infrastructure deals should not be benchmarked against startup technology exits.

YearAcquirerTargetWhat was boughtTypeValue
2020Baker HughesCompact Carbon CaptureRotating-bed capture technologyTuck-inn.a.
2020SaipemCO₂ SolutionsEnzyme-based capture technologyTuck-inn.a.
2022Baker HughesMosaic MaterialsMOF sorbentsTuck-inn.a.
2023OccidentalCarbon EngineeringDirect air capture technologyTechnology$1.1bn
2023ExxonMobilDenburyCO₂ pipeline and storage networkInfrastructure$4.9bn
2026AirhiveCarbyonDirect air capture, startup to startupConsolidationn.a.
2026TerradotEionEnhanced rock weathering, startup to startupConsolidationn.a.

n.a.: value not disclosed in our sources. Links lead to the companies' announcements where we have them.

02 / Our investment theses

Investment thesis 01

Modular capture & conditioning

Look for. Proprietary modules for concentrated or biogenic CO₂ streams that can be deployed repeatedly.

Validate. Performance at industrial scale; full-chain cost per tonne; limited site-specific engineering; buyer demand; compliant storage or use.

Investment thesis 02

Durable carbon removal

Look for. CDR pathways converting contracts into verified, delivered tonnes at declining cost.

Validate. Net removal, MRV and permanence; actual delivery; bankable, diversified offtake; environmental safeguards; a route to project finance.

Investment thesis 03

Mineralisation & CO₂-based materials

Look for. Products competitive on price and performance without relying on carbon credits.

Validate. Paying customers; industrial qualification; unit economics; feedstock and energy exposure; durable CO₂ binding where claimed.

Investment thesis 04

Enabling technologies

Look for. MRV, sensors, process optimisation, conditioning or logistics solving repeatable problems across projects.

Validate. Clear payer; integration into standards and workflows; recurring revenue; low services intensity; adoption as deployments scale.

03 / Detailed startup mapping

The semicircle maps 43 European CCUS and CDR startups across three economic universes: 01 / Industrial capture (point-source CO₂ and EU ETS incentives where eligible), 02 / Carbon removal (CDR) (durable removal credits purchased on carbon markets) and 03 / CO₂ utilisation (CCU) (materials, chemicals and other products). Six technology pathways sit within the arcs. Some startups have multiple activities or serve several markets; their placement reflects the primary pathway for this mapping, not exclusive eligibility or revenue mix. Select a logo to explore each company.

Swipe sideways to explore →

01 / INDUSTRIAL CAPTURE02 / CARBON REMOVAL (CDR)03 / CO₂ UTILISATION (CCU)POINT-SOURCE CAPTUREDIRECT AIR CAPTUREROCK WEATHERINGOCEAN-BASED CDRMINERALISATIONCO₂ CONVERSIONTERNEL
ContextSelect a company to see its technology and business model. A startup can span several markets; the map shows one main activity.

Mapping criteria. European CCUS and CDR startups developing proprietary technologies across carbon capture, storage, utilisation or carbon removal. Pure nature-based solutions are excluded, as are companies reported to have raised more than €30m. Focus on independent private companies, not large corporates, listed businesses or standalone infrastructure projects. Geography includes European countries outside the EU. Non-exhaustive; data and funding fields rely on public and manually collected information and may be incomplete.

Conclusion

Back what repeats.

Carbon capture, removal and use is a family of businesses with a shared toolbox and very different economics. Industrial CCUS has real regulatory demand and constrained economics. Durable CDR has strong demand signals and an immature delivery market. Utilisation depends on product economics before carbon markets. Enabling technologies can be the most capital-efficient layer, once the market is proven.

Our 43-company European mapping highlights a dense DAC field, alternatives in industrial capture and mineralisation, and a blind spot on standalone enabling businesses. We look for climate integrity, a clearly identified payer, credible non-dilutive or asset financing as deployments scale, and proprietary technology that can repeat across projects. These are investment hypotheses, not conclusions about the size of the market.

Building in this space?

Talk to us
Glossary
CCUS, CCSCarbon capture, utilisation and storage. CCS is the same without the use part.
CDRCarbon dioxide removal: taking CO₂ that is already in the air and keeping it out for a long time.
DAC, DACCSDirect air capture, and direct air capture with permanent storage of the captured CO₂.
BECCSBioenergy production combined with CO₂ capture and permanent storage.
BioCCSBroader capture and storage of biogenic CO₂, including non-energy sources.
ERW, OAEEnhanced rock weathering on farmland, and ocean alkalinity enhancement.
EU ETS, EUAThe EU carbon market. Companies hold one allowance (EUA) per tonne they emit, and its price is the carbon price.
CRCFThe EU certification framework for carbon removals. It certifies a removal and leaves the buyer and any ETS benefit open.
CBAMThe EU border mechanism that puts a carbon cost on some imported goods.
NZIAThe EU Net-Zero Industry Act, with a target of at least 50 Mt/yr of EU CO₂ injection capacity by 2030.
45QUS tax credit for stored CO₂: up to USD 85/t for industrial capture and USD 180/t for DAC under qualifying conditions.
MRVMeasurement, reporting and verification of the CO₂ actually captured or removed.
T&STransport and storage of CO₂.
OfftakeA contract where a buyer commits to purchase future output, in tonnes or product.
FIDFinal investment decision: the point where a project is financed and construction starts.
EPCEngineering, procurement and construction contractor that builds the plant.
Mt, Mt/yrMillion tonnes, and million tonnes per year.